{"id":147,"date":"2026-02-26T18:26:14","date_gmt":"2026-02-26T18:26:14","guid":{"rendered":"https:\/\/indimaxim.com\/?page_id=147"},"modified":"2026-02-26T18:26:14","modified_gmt":"2026-02-26T18:26:14","slug":"sqa","status":"publish","type":"page","link":"https:\/\/indimaxim.com\/?page_id=147","title":{"rendered":"SQA"},"content":{"rendered":"\n<div class=\"wp-block-group alignfull has-global-padding is-layout-constrained wp-container-core-group-is-layout-669513ed wp-block-group-is-layout-constrained\" style=\"margin-top:0;margin-bottom:0;padding-top:var(--wp--preset--spacing--50);padding-right:var(--wp--preset--spacing--50);padding-bottom:var(--wp--preset--spacing--50);padding-left:var(--wp--preset--spacing--50)\">\n<div class=\"wp-block-group alignwide has-base-2-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-a151063b wp-block-group-is-layout-constrained\" style=\"border-radius:16px;padding-top:var(--wp--preset--spacing--50);padding-right:var(--wp--preset--spacing--40);padding-bottom:var(--wp--preset--spacing--50);padding-left:var(--wp--preset--spacing--40)\">\n<div class=\"wp-block-group alignwide is-vertical is-content-justification-stretch is-layout-flex wp-container-core-group-is-layout-353c4f5a wp-block-group-is-layout-flex\">\n<h2 class=\"wp-block-heading has-text-align-center\">Software Quality Assurance (SQA) Services<\/h2>\n\n\n\n<p class=\"has-text-align-center\" style=\"margin-top:var(--wp--preset--spacing--10);font-size:clamp(0.875rem, 0.875rem + ((1vw - 0.2rem) * 0.417), 1.125rem);\">Ensuring Process Integrity for Airborne Systems<\/p>\n\n\n\n<p class=\"has-text-align-center\" style=\"margin-top:var(--wp--preset--spacing--10);font-size:clamp(0.875rem, 0.875rem + ((1vw - 0.2rem) * 0.417), 1.125rem);\">In safety-critical environments, the &#8220;how&#8221; is just as important as the &#8220;what.&#8221; Our SQA services ensure that every phase of the software life cycle\u2014from initial planning to final certification\u2014is compliant with <strong>DO-178C<\/strong> standards and your internal <strong>Software Quality Assurance Plan (SQAP)<\/strong>.<\/p>\n<\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Our SQA Core Responsibilities<\/h3>\n\n\n\n<p>We act as the objective bridge between development and certification, focusing on three primary pillars:<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">1. Process Assurance &amp; Audits<\/h4>\n\n\n\n<p>We conduct systematic audits to ensure that the transition criteria between life cycle stages are met.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Conformity Reviews:<\/strong> Verifying that the software product is consistent with the specified requirements.<\/li>\n\n\n\n<li><strong>Stage of Involvement (SOI) Readiness:<\/strong> We prepare your team for the four critical FAA\/EASA SOI audits (Planning, Development, Verification, and Final Certification).<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">2. Product Integrity<\/h4>\n\n\n\n<p>SQA ensures that the outputs of the software process are accurate and complete.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Documentation Review:<\/strong> Rigorous checks of the PSAC, SAS, and SCI for consistency.<\/li>\n\n\n\n<li><strong>Problem Reporting Oversight:<\/strong> Monitoring the lifecycle of software &#8220;bugs&#8221; or deviations to ensure they are closed with proper justification.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">3. Transition Criteria Verification<\/h4>\n\n\n\n<p>We ensure that no stage of development begins until the previous stage is &#8220;SQA Approved,&#8221; preventing the &#8220;cascading error&#8221; effect in complex systems.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">DO-178C Compliance &amp; Life Cycle Data Checklist<\/h2>\n\n\n\n<p>Our SQA service oversees the generation, review, and archival of the following mandatory outputs to ensure your project is &#8220;Audit-Ready.&#8221;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Planning Process Outputs<\/h3>\n\n\n\n<p>SQA ensures these foundational documents are established before development begins.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>[ ] <strong>PSAC:<\/strong> Plan for Software Aspects of Certification<\/li>\n\n\n\n<li>[ ] <strong>SDP:<\/strong> Software Development Plan<\/li>\n\n\n\n<li>[ ] <strong>SVP:<\/strong> Software Verification Plan<\/li>\n\n\n\n<li>[ ] <strong>SCMP:<\/strong> Software Configuration Management Plan<\/li>\n\n\n\n<li>[ ] <strong>SQAP:<\/strong> Software Quality Assurance Plan<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">2. Development &amp; Design Outputs<\/h3>\n\n\n\n<p>We verify that the design follows the standards defined in the planning phase.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>[ ] <strong>SRD:<\/strong> Software Requirements Data (High-Level Requirements)<\/li>\n\n\n\n<li>[ ] <strong>SDD:<\/strong> Software Design Description (Low-Level Requirements)<\/li>\n\n\n\n<li>[ ] <strong>Source Code:<\/strong> Verified against coding standards (MISRA\/CERT) via <strong>LDRA<\/strong>.<\/li>\n\n\n\n<li>[ ] <strong>Executable Object Code:<\/strong> The final binary to be loaded into the hardware.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">3. Verification &amp; Test Outputs<\/h3>\n\n\n\n<p>Using our <strong>LDRA automation expertise<\/strong>, we ensure the following evidence is captured:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>[ ] <strong>SVCP:<\/strong> Software Verification Control Plan (Test Procedures)<\/li>\n\n\n\n<li>[ ] <strong>SVR:<\/strong> Software Verification Results (Test Reports)<\/li>\n\n\n\n<li>[ ] <strong>Structural Coverage Analysis:<\/strong> Proof of Statement, Decision, or <strong>MC\/DC<\/strong> coverage.<\/li>\n\n\n\n<li>[ ] <strong>LTR:<\/strong> LDRA Tool Reports (Static and Dynamic analysis evidence).<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">4. Configuration &amp; Summary Outputs<\/h3>\n\n\n\n<p>The final &#8220;Proof of Compliance&#8221; required for the closing Stage of Involvement (SOI) audits.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>[ ] <strong>SCI:<\/strong> Software Configuration Index (The &#8220;Master List&#8221; of all components)<\/li>\n\n\n\n<li>[ ] <strong>SEC:<\/strong> Software Lifecycle Environment Configuration (Tools and OS versions)<\/li>\n\n\n\n<li>[ ] <strong>SAS:<\/strong> Software Accomplishment Summary (The final report to the regulator)<\/li>\n\n\n\n<li>[ ] <strong>Problem Reports:<\/strong> A full history of identified issues and their resolutions.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\">The &#8220;Four-Eyes&#8221; Principle<\/h3>\n\n\n\n<p>For <strong>DAL A and B<\/strong> systems, DO-178C requires <strong>Independence<\/strong>. Our SQA team provides this by:<\/p>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li><strong>Reviewing<\/strong> the work of the development team.<\/li>\n\n\n\n<li><strong>Verifying<\/strong> that the test results (SVR) match the expected outcomes in the SVCP.<\/li>\n\n\n\n<li><strong>Certifying<\/strong> that the LDRA tool qualification (DO-330) is correctly applied.<\/li>\n<\/ol>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\">Strategic Partnership Benefit<\/h3>\n\n\n\n<p>Because we have partnered with two specialized software verification firms for the last two years, we have a refined <strong>transition checklist<\/strong> that facilitates the hand-off between the development team and the verification team. This minimizes delays during the <strong>SOI-3 (Verification)<\/strong> and <strong>SOI-4 (Final)<\/strong> audits.<\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Software Quality Assurance (SQA) Services Ensuring Process Integrity for Airborne Systems In safety-critical environments, the &#8220;how&#8221; is just as important as the &#8220;what.&#8221; Our SQA services ensure that every phase of the software life cycle\u2014from initial planning to final certification\u2014is compliant with DO-178C standards and your internal Software Quality Assurance Plan (SQAP). Our SQA Core [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-147","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/indimaxim.com\/index.php?rest_route=\/wp\/v2\/pages\/147","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/indimaxim.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/indimaxim.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/indimaxim.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/indimaxim.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=147"}],"version-history":[{"count":1,"href":"https:\/\/indimaxim.com\/index.php?rest_route=\/wp\/v2\/pages\/147\/revisions"}],"predecessor-version":[{"id":148,"href":"https:\/\/indimaxim.com\/index.php?rest_route=\/wp\/v2\/pages\/147\/revisions\/148"}],"wp:attachment":[{"href":"https:\/\/indimaxim.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=147"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}